Configure AI Estimate PDF Import Workflow
The AI PDF Estimate Import tool streamlines the process of adding estimate line items to your project workbook. Instead of manually rebuilding estimates received from carriers or third parties, you can upload a PDF and the AI will extract the relevant data. This article walks you through configuring the tool, uploading estimates, and reviewing the imported line items.
Before You Begin
You'll need PDF estimates from carriers or other third parties that contain line item data. Make sure the following are in place before you start:
| Requirement | Why it matters |
|---|---|
| AI parsing tool enabled | This feature is only available when the AI parsing tool is active for your brand. If you see an Extractor list instead of the AI upload, contact support to turn it on. |
| PDF estimate | The AI tool processes PDF documents to extract line items. |
| Access to Project Settings | Mapping tokens are configured in Project Settings. |
Configure Estimate PDF Import Settings
Before using the AI PDF Estimate Import, you can map tokens from your estimates to specific destination fields within your project settings. This ensures the extracted data is correctly categorized.
- In your settings, navigate to Projects.
- Within Project Settings, locate the Estimate PDF Import option and expand it.
- On the left, you'll see Available PDF Tokens — these are the pieces of data the AI can extract from your PDFs.
- On the right are the destination fields (Name, Group, Subcategory, Description) where the extracted data will be mapped.
- Map the available tokens to your destination fields by dragging and dropping them, or by clicking the + icon next to a field.
Tip — token formatting:
- Wrap each token in double curly braces.
- Tokens are case sensitive
- You can combine multiple tokens with plain text
Available tokens
The tokens below can be mapped to any destination field. These are the same field types used by the Xactimate Integration, so if you already map line items there, the naming will feel familiar.
| Token | What it represents |
|---|---|
|
LineNumber |
The line item's number as it appears on the estimate. |
| Description | The line item description. |
| Room | The room or area the line item belongs to. |
| Category | The estimate Category (CAT) — the type of work, such as general demolition, drywall, or appliances. |
| Selector | The Selector code (SEL) for the line item. |
| Action | The work action tied to the line item — for example Remove, Replace, Remove & Replace, Detach & Reset, Install Only, or Material Only. |
| Notes | Any notes captured for the line item. |
When you're finished mapping, click Update to save your configuration.
Default templates: If you haven't changed anything, Albi uses these:
| Field | Default | Notes |
| Name | LineNumber - Description | Required. If a line has no line number, the extra dash is removed. |
| Group | Room | Required. Each room becomes a group in your Workbook. |
| Subcategory | Empty | Optional. Subcategory is meant for cost type (such as Labour, Material, or Equipment), not the trade. |
| Description | Notes | Optional. |
Note: Templates are applied when the estimate is created. Changing them later won't update estimates you've already imported. Upload the PDF again to apply the new templates.
Tip for Sage Intacct users: Subcategory maps to your Intacct cost types. Avoid setting Subcategory to the Category token, since every trade code would become a new subcategory that needs its own cost-type mapping before the project can sync.
Upload an Estimate PDF
Once your settings are configured, you can upload PDF estimates directly into your project workbook. The AI will automatically begin extracting line items.
- Open the project and go to Workbook, then Estimates.
- Click Upload, then Upload Estimate From PDF.
- In the Upload PDF window, choose your PDF. You can upload one file at a time, and it must be a .pdf file.
- Your upload appears in the History list with its status: Queued, Processing, Completed, or Failed.
- You don't need to wait on this screen. Processing keeps going in the background, and you'll get an in-app notification and an email when it's done.
Review and Finalize Imported Estimates
After the AI processes the PDF, you can review the extracted line items, make any necessary adjustments, and finalize the import.
- When processing finishes, the estimate is created for you. It's listed in Workbook, then Estimates, with the status Review Import.
- Click Review to open the estimate.
- Check the banner at the top for any warnings, such as a total that doesn't match the PDF.
- Look for highlighted rows. These are items the AI wasn't sure about. Compare each one with the PDF using the # column, which shows the PDF's line numbers.
- Correct any rows that need it and save. Saving a highlighted row clears its highlight.
- Save the estimate, send it for signature, or mark it Signed as usual. Once it's signed, the line items move into the Items section of your Workbook.
For a full walkthrough of the review screens and what each warning means, see Review AI Estimate PDF Imports: Totals, Warnings, and Flagged Items.
From the Items section, you can use the imported line items for budgeting, work orders, or purchase orders.
Troubleshooting
Use the table below to resolve common issues when importing AI PDF estimates.
| Issue | Recommended action |
| Estimate not processing | Check the status in the Upload PDF window. Long estimates can take several minutes. If it's still processing after an hour, contact support with the project and file name. |
| Upload shows Failed | The PDF couldn't be read. Try uploading it again. If it fails a second time, contact support with the project and file name. |
| Incorrect line item extraction | Review the highlighted rows and any warnings on the estimate's banner, then correct the rows using the PDF's line numbers in the # column. |
| Imported total doesn't match the PDF | Check the warnings on the banner. They name the room or line numbers to fix. Correct those before you send the estimate. |
| Missing data in workbook | Make sure the estimate is marked as Signed after review so its line items move to the Items section. |
| AI parsing tool not available | If you see an Extractor list instead of the AI upload, contact support to confirm the AI parsing tool is turned on for your brand. |
Related Articles
- Review AI Estimate PDF Imports: Totals, Warnings, and Flagged Items — how to read the review screens, fix flagged items, and what each warning means.
- Xactimate Integration — how line item tokens (Category, Selector, Action, etc.) map into Albiware columns through the Xactimate integration.